Skip Ribbon Commands
Skip to main content
Sign In
Careers Board Meetings Live Chat

Fleetwood Reservoir and Water Main

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

​Fleetwood Reservoir and First Nations mural now complete

On Friday, April 10, Metro Vancouver gathered with Indigenous artist Elinor Atkins and q́ʷɑ:ńƛ̓əń (Kwantlen First Nation) to celebrate the completion of the Fleetwood Reservoir, an essential piece of drinking water infrastructure supporting growing communities south of the Fraser River.

The celebration also highlighted the glass mural designed by Indigenous artist Elinor Atkins. Integrated into the reservoir at Meagan Anne MacDougall Park, the artwork reflects the cultural and spiritual significance of water and reinforces Metro Vancouver’s commitment to meaningful collaboration with Indigenous peoples.

 

 

Fleetwood Reservoir and Water MainFleetwood Reservoir and Water Main<div class="ExternalClassBBFC47C05C744BD5AA2C138BCF1F5D22"><p>Metro Vancouver has completed construction of a new reservoir at Meagan Anne MacDougall Park in Surrey. This essential project increases the delivery of high-quality drinking water to growing communities south of the Fraser River.</p><p>The Fleetwood Reservoir project occurred from summer 2022 to spring 2026. The facility is now complete and connected to the Fleetwood Water Main and the City of Surrey’s Fleetwood Pump Station. </p><p>As part of the restoration, a mural by Elinor Atkins, a q̓ʷɑ:n̓ƛ̓ən̓ artist, was installed on the reservoir's maintenance building. The artwork highlights the theme of water conservation and celebrates the sustainable paths being created for future generations. Two signs in front of the mural explain Metro Vancouver’s drinking water system and share information about the artist and the inspiration behind the artwork.​<br></p><p>The Fleetwood Water Main project took place from 2021 to 2023. Metro Vancouver also constructed a new underground valve chamber for the Fleetwood Water Main at the corner of 153A Street and 95 Avenue from 2024 to 2025. ​<br></p></div>City of SurreyProject

 

 

Reservoir and Water Main Projects Completed!Reservoir and Water Main Projects Completed!<div class="ExternalClassDB0BFBE198464740866ABE0CB4298CD1"><p>Metro Vancouver has completed construction of the Fleetwood Reservoir at Meagan Anne MacDougall Park and a valve chamber for the Fleetwood Water Main near 153A Street in Surrey! <br></p><p>The park is now fully open to the public and the reservoir is operational and connected to the City of Surrey’s Fleetwood Pump Station. <br></p><p>Thank you for your patience while we completed these drinking water infrastructure projects in your neighbourhood.  <br></p><p>Please read <a href="/services/water/ConstructionDocuments/fleetwood-reservoir-%26-water-main-newsletter-project-completion-2026-06-26.pdf">our newsletter</a> to learn more.<br></p></div>7/2/2026 7:00:00 AM

 

 

map-fleetwood-projects-site-layouthttps://metrovancouver.org/services/water/ConstructionImages/_t/map-fleetwood-projects-site-layout_jpg.jpgmap-fleetwood-projects-site-layout

 

 

Project activitiesProject activities<div class="ExternalClassEB06E3E4BB6B4D03819D6C566059B7DB"><p><strong>Fleetwood Reservoir</strong></p><p>Activities related to the construction of the Fleetwood Reservoir will include:</p><ul><li> <strong>Site preparation:</strong> To ensure the park is ready for construction, our contractor will finalize the installation of tree protection fences, install the noise barriers, and set up two areas to store construction trailers, equipment, and supplies. Temporary fencing and signage will also be installed around the site to keep crew members, pedestrians, and cyclists safe throughout construction.</li><li> <strong>Reservoir and maintenance access building Construction:</strong> Once site preparation is complete, the contractor will excavate a nine-metre-deep and 50-metre-wide area in the project site to construct the underground concrete reservoir and maintenance access building, which will be located next to City of Surrey’s Pump Station.</li><li> <strong>Valve chamber construction:</strong> Crew members will also build an underground valve chamber, and an above ground emergency exit due to its large size. The valve chamber will be used to regulate water flow and isolate sections of the distribution system to conduct maintenance and repair work in the future. An additional emergency exit will be constructed due to the large size of the underground valve chamber.</li><li> <strong>Overflow drain installation:</strong> The contractor will excavate a 105-metre-long trench at the southern area of the park and install a 35" diameter overflow pipe – a critical piece of infrastructure that will control the water flow in an unlikely event of reservoir overfilling.<br></li></ul><div><strong>Fleetwood Water Main - Valve chamber construction</strong>​<br></div><div> <br> </div><div>During the construction of the new underground valve chamber for the Fleetwood Water Main, crews will:<br></div><div><ul><li>Install temporary fencing around the work area to ensure safety of workers and pedestrians</li><li>Deliver construction materials and equipment to the work zone</li><li>Excavate an area that is approximately 17 metres long, 15 metres wide, and 5.5 metres deep, which is about the size of a small basketball court</li><li>Construct the underground valve chamber and install the pipe connections and valves</li><li>Disinfect the new valve chamber and water main</li><li>Remove approximately 10 trees located within the work area</li><li>Install tree protection fencing to safeguard trees that should not be removed</li><li>Restore the impacted area to its previous condition or better, including replanting trees ​<br></li></ul></div></div>
Work hoursWork hours<div class="ExternalClass5AB5CE20A94E483D8E333C278248FE24"><p>All work will comply with City of Surrey bylaws or granted bylaw variances. Typical work hours for this project will be:</p><ul><li>Monday to Saturday: 7:00 am – 6:00 pm</li><li>Sundays and holidays: No work planned</li></ul><p>There may be times when construction crews will need to work longer hours or on weekends to complete certain tasks. In these cases, Metro Vancouver will provide notification to the community ahead of time.</p> ​​<br></div>
Impacts and mitigationImpacts and mitigation<div class="ExternalClass35978FCED96D4018B6B8F233C22AE5EE"><p><strong>Fleetwood Reservoir</strong>​<br></p><p>Metro Vancouver will actively work with the contractor to monitor and manage project related traffic throughout construction. To minimize traffic impacts, our contractor will:</p><ul><li>Deliver construction material and equipment via Fleetwood Way. 154 Street will only be used for crew access and special deliveries</li><li>Maintain the temporary walking path on Fleetwood Way and 154 Street to allow pedestrians to safely cross the streets</li><li>Place traffic control personnel and signage on-site to ensure drivers, pedestrians, and cyclists can safely move around the construction area. Additional personnel will be in place during school start and end hours</li><li>Remove equipment and obstructions to maximize public access to roadways and sidewalks at the end of each work day<br></li></ul><p> <strong>How will this project impact the local community?</strong></p><p>Metro Vancouver recognizes that construction activities will impact the Fleetwood community and park visitors. As part of our commitment to minimize project impacts wherever possible, we identified potential impacts early in the process and planned measures to prevent or reduce them during construction.</p><p> <strong>Keep park partially open</strong></p><p>For safety reasons, a large part of Meagan Anne MacDougall Park will be closed during construction, including the existing playground. The contractor will create a temporary walking path through the park to allow visitors to safely enjoy the areas that will remain open.</p><p> <strong>Reduce noise and vibration</strong></p><p>Based on the feedback received during the 2019 open house, we will install sound barriers along the construction site:</p><ul><li>10" high, precast concrete noise barriers on the west and east sides</li><li>Modular fencing with sound blankets on the north and south sides</li></ul><p>The sound barriers will contain the noise within the site or force the sound to travel a longer distance before reaching residences located near the project area.</p><p>​​<strong>Fleetwood Water Main – Valve chamber construction</strong></p><ul><li> <strong>Traffic and access: </strong>The pathway at the corner of 153A Street and 95 Avenue to Green Timbers Greenway will be temporarily closed, while the pathway on 154 Street and 95 Avenue will remain open. There will be an increase in traffic near the work area as construction vehicles will use this route to enter and exit the site. T​​he roadway may be partially closed during setup and special deliveries; however, access to driveways will be maintained at all times. There will be traffic control personnel redirecting traffic as needed during construction.</li><li> <strong>Noise: </strong>The operation of heavy construction equipment and vehicles, including cranes, hydro-vacuum trucks, and excavators, may make moderate noise. Our crews are committed to minimizing noise impacts whenever possible.</li><li> <strong>Mailbox relocation: </strong>We will temporarily relocate the Canada Post mailbox from the corner of 153A Street and 95 Avenue to a nearby location. This relocation will be in effect during construction, beginning in mid-September.</li></ul></div>
Restoration planRestoration plan<div class="ExternalClass915A187CDE834F0E9553D5DB92689481"><p>Metro Vancouver and the City of Surrey have been working closely to develop a comprehensive site replanting and landscape plan that is in line with sustainable practices to support park biodiversity and ecological health.</p><p>We have also redesigned the overflow drain with input received from residents, which will minimize tree removal during construction.</p><p>As part of Metro Vancouver’s commitment to enhance tree canopy in urban areas, we aim to replant double the amount of healthy trees we remove. In addition to that, we will replant over 2,000 shrubs, grasses and groundcover from over 20 varieties in the park. The new green area will provide year-round habitat for birds and butterflies, and visual interest to visitors.</p><p>City of Surrey will also perform park improvements, which will include designing and installing a new playground.<br></p>​ <p> <strong>Mural and Sign</strong></p><p>Metro Vancouver installed a mural designed by q̓ʷɑ:n̓ƛ̓ən̓ (Kwantlen First Nation) artist Elinor Atkins on the maintenance building. The artwork reflects the cultural and spiritual significance of water, and celebrates the sustainable ways being created for future generations. Signage near the mural feature information about the regional drinking water system, as well as the artist and the inspiration behind the artwork.</p><p> <img src="/services/water/ConstructionImages/mural-fleetwood-reservoir.jpg" alt="Cultural Recognition Fleetwood Reservoir" />​<br>Mural designed by q̓ʷɑ:n̓ƛ̓ən̓ (Kwantlen First Nation) artist Elinor Atkins. You can <a href="/services/water/ConstructionDocuments/indigenous-artist-elinor-atkins-fleetwood-reservoir.pdf" target="_blank">see ​the artwork in more detail</a>.​<br></p><p> <img src="/services/water/ConstructionImages/cultural-recognition-fleetwood-reservoir.jpg" alt="Cultural Recognition Fleetwood Reservoir" />​​ <br>You can <a href="/services/water/ConstructionDocuments/cultural-recognition-fleetwood-reservoir.pdf" target="_blank">read the sign</a>.</p></div>
EngagementEngagement<div class="ExternalClassEA255FB6BC804ADAB23450B0311611FE"><p>At Metro Vancouver we make decisions that impact nearly 3 million residents that live in our region. Metro Vancouver engages municipalities, businesses and the general public whenever we are working on a new program, policy, or project across our service areas. Learn more about our <a href="/about-us/community-engagement" title="engagement principles">engagement principles</a>.​<br></p><p> <strong>2019 Open house</strong></p><p>Metro Vancouver held an open house for the Fleetwood Reservoir and Water Main projects on September 28, 2019.</p><p> <strong>What we heard</strong></p><p>We received comments and requests from the local community on aspects that matter the most to them in this Project. Below is a high-level summary of what we heard:</p><ul><li>Interest in noise, methodology and vibration related to construction activities</li><li>Questions about site access and safety, construction traffic, and maintenance of temporary park pathway</li><li>Requests for residents to continue to be informed about project activities, including timelines<br></li></ul><p>Where possible, we will incorporate your feedback into our project plans and we will report back on how we are using your input as the project progresses.</p><p> <strong>Supporting materials</strong></p><ul class="fa-ul"><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span><a href="/services/water/ConstructionDocuments/fleetwood-open-house-panels-oct-2019.PDF" target="_blank">D​​isplay Panels</a>​</li><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span>​<a href="/services/water/ConstructionDocuments/fleetwood-reservoir-engagement-summary-feedback-highlights.pdf" target="_blank">Feedback Highlights</a>​<br></li></ul><div><p> <strong>Working with the community</strong></p><p>Thank you to those who provided feedback during the planning phase of this project. Metro Vancouver is committed to continued collaboration with the City of Surrey and Fleetwood community to ensure concerns and interests are considered as the project progresses. A community liaison is available to answer questions and listen to concerns throughout the project.</p><p>Local residents and businesses will receive ongoing updates through print notifications, email, web updates, and on-site signage. You can <a href="/services/water/water-engagement-mailing-list" title="subscribe to our mailing list">subscribe to our mailing list</a> to receive regular updates via email.​</p></div></div>
Project materialsProject materials<div class="ExternalClassF9F2ED0AEB8548858DA69AD7C329CF9A"><ul class="fa-ul"><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span>​ ​​​<a href="/services/water/ConstructionDocuments/Fact-Sheet-Fleetwood-Reservoir-Project.pdf">Fact Sheet - Fleetwood Reservoir</a><br></li></ul> ​​​<strong>Newsletters​​​</strong>​ <ul class="fa-ul"><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span>​ <a href="/services/water/ConstructionDocuments/fleetwood-reservoir-%26-water-main-newsletter-project-completion-2026-06-26.pdf">2026 - June 26 - Project Completion - Fleetwood Reservoir & Water Main​</a><br></li><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span>​ <a href="/services/water/ConstructionDocuments/fleetwood-reservoir-newsletter-project-update-2025-12-11.pdf">2025 - Decem​ber 11 - Project Update - Fleetwood Reservoir​</a><br></li><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span> <a href="/services/water/ConstructionDocuments/newsletter-project-update-fleetwood-reservoir-2025-06-03.pdf">2025 - June 3 - Project Update - Fleetwood Reservoir​</a><br></li><li> <span class="fa-li"><i class="fa-light fa-file"></i> </span> <a href="/services/water/ConstructionDocuments/fleetwood-water-main-valve-chamber-construction-update-newsletter-2025-06-04.pdf">​​​</a><a href="/services/water/ConstructionDocuments/fleetwood-water-main-valve-chamber-construction-update-newsletter-2025-06-04.pdf">2025 - June 3 - Project Update - Fleetwood Water Main - Valve Chamber Construction​</a><br></li><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span>​<a href="/services/water/ConstructionDocuments/newsletter-project-update-fleetwood-reservoir-october-2024.pdf">2024 – October 28 – Project U​pdate​​</a>​<br></li><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span> <a href="/services/water/ConstructionDocuments/fleetwood-water-main-valve-chamber-construction-newsletter-september-2024.pdf">2024 – September 9 – Upcoming Construction - Fleetwood Water Main - Valve Chamber Construction​</a>​​​​​<br></li><li> <span class="fa-li"><i class="fa-light fa-file"></i> </span>​<a href="/services/water/ConstructionDocuments/2024-may-fleetwood-reservior-project-update.pdf">2024 – May 17 – Project Update​</a>​<br></li><li> <span class="fa-li"><i class="fa-light fa-file"></i> </span>​​​​​​​​​<a href="/services/water/ConstructionDocuments/Fleetwood-Reservoir-Newsletter-Dec2023.pdf">2023 – Dece​mber 18 – Project Update and Holiday Construction Schedule​</a>​ <br></li><li> <span class="fa-li"><i class="fa-light fa-file"></i> </span>​<a href="/services/water/ConstructionDocuments/fleetwood-reservoir-project-update-newsletter-june2023.pdf">2023 – June 22 – Extended Hours of Work​</a><br></li><li> <span class="fa-li"><i class="fa-light fa-file"></i> </span><a href="/services/water/ConstructionDocuments/fleetwood-reservoir-project-update-newsletter-may2023.pdf">2023 – May 22 – Project Update</a>​<br></li></ul>​​<br></div>
Related linksRelated links<div class="ExternalClass6A2B9354CFB94DC186030A044F4D80B3"><ul class="fa-ul"><li> <span class="fa-li"> <i class="fa-light fa-link"></i> </span>​<a href="/services/water/the-regional-system">Regional Drinking Water System</a> </li><li> <span class="fa-li"> <i class="fa-light fa-link"></i> </span>​​<a href="https://www.itsalldrinkingwater.ca/">Water conservation tips</a>​<br></li></ul></div>

 

 

Fleetwood Reservoir and Water MainFleetwood Reservoir and Water Main646219931

 

 

Summer 2021 – summer 2023Summer 2021 – summer 2023<div class="ExternalClassA1A501E25E124F35A0C603907B7109EC">Fleetwood Water Main construction​​<br></div>0
Summer 2022 - spring 2026Summer 2022 - spring 2026<div class="ExternalClass49FFE1ADFF724621BD6FDB157DD8DC35">Fleetwood Reservoir construction and restoration​<br></div>0
Fall 2024 – spring 2025Fall 2024 – spring 2025<div class="ExternalClassC1ADF6A413844BCCAEC4EB17E90EDF0E">​Fleetwood Water Main​ valve chamber construction<br></div>0
Summer 2025Summer 2025<div class="ExternalClass05E0DC8A966D4F34BF6253B870903BE0"><p>​Fleetwood Water Main commissioning​<br></p></div>0

Contact us


Community liaison
Monday – Friday
8:00 am – 4:30 pm

  • Email
  • 604-432-6200​​​

After hours emergencies

  • 604-451-6610​​​

Stay connected


Subscribe to our mailing list to receive updates about our water projects.

Sign Up​​​​​

This website uses cookies to ensure you get the best experience. By continuing to use this site, you accept our use of cookies. View our privacy statement.