Centre Shaft SiteCentre Shaft Site<div class="ExternalClassF8AAA029BA3A42ADA664CADC4E0FD265"><p>The new Stanley Park Water Supply Tunnel will replace an existing water main that was built in the 1930s and is at the end of its service life. The new water supply tunnel is being built to withstand a major earthquake. Once complete, it will help the cities of Vancouver and Richmond meet the growing demand for water and ensure continued access to safe and clean drinking water for years to come.</p><p>This major infrastructure project will include the installation of new valve chambers and pipes that will connect the new water main to the region’s existing water distribution system. The project will include the installation of three tunnel shafts, including the centre shaft located in the Stanley Park Service Yard area. </p><p>The centre shaft site will be the main construction area for the project and will include the construction of a shaft that will be used to excavate the tunnel and remove excavated material. No permanent infrastructure will be installed at this site.</p><p>Construction of the Stanley Park Water Supply Tunnel is expected to run from late 2024 through 2029.<br></p><p> <i class="fa-light fa-file">​</i> ​<a href="/services/water/ConstructionDocuments/fact-sheet-stanley-park-water-supply-tunnel-centre-shaft-site.pdf" target="_blank">Stanley Park Water Supply Tunnel – centre shaft site fact sheet</a></p>​ </div>City of Vancouver

 

 

 

 

Centre Shaft Site - Key project locations maphttps://metrovancouver.org/services/water/ConstructionImages/_t/Map-Key_Project_Locations-Stanley_Park_Water_Supply_Tunnel_2_jpg.jpgCentre Shaft Site - Key project locations map
Construction area maphttps://metrovancouver.org/services/water/ConstructionImages/_t/Map-Construction_Area-Centre_Shaft_Site-SPWST_jpg.jpgConstruction area map
Truck routes map - Centre shaft sitehttps://metrovancouver.org/services/water/ConstructionImages/_t/Map-Truck_Routes-SPWST-Centre_Shaft_Site_jpg.jpgTruck routes map - Centre shaft site

 

 

Project materialsProject materials<div class="ExternalClass14197AD95749417B9D00D60BF5E6FF78">​ <ul class="fa-ul"><li> <span class="fa-li"> <i class="fa-light fa-file"></i> </span>​<a href="/services/water/ConstructionDocuments/fact-sheet-stanley-park-water-supply-tunnel-centre-shaft-site.pdf" target="_blank">Fact Sheet – Stanley Park Water Supply Tunnel – Centre Shaft Site</a>​​​​​</li><li> <span class="fa-li"> <i class="fa-light fa-link"></i> </span>​<a href="/services/water/the-regional-system" target="_blank">Learn about Metro Vancouver’s drinking water system</a></li></ul></div>

 

 

Late 2024 - 2029Late 2024 - 2029<div class="ExternalClass6EC32531C87F4BCCA637B2A695F13342">​Construction</div>0

Contact us


Community liaison
Monday – Friday
8:00 am – 4:30 pm

  • Email
  • 604-432-6200​​​

After hours emergencies

  • 604-451-6610​​​​

Stay connected


Subscribe to our mailing list to receive updates about our water projects.

Sign Up​​​​​​​