Skip Ribbon Commands
Skip to main content
Sign In
Careers Board Meetings Live Chat

Annacis Water Main South – Scott Road Section

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

 

 

Annacis Water Main South – Scott Road Section Annacis Water Main South – Scott Road Section <div class="ExternalClass18EA35BAD45B4BA88FD759324619AFC8"><p>Metro Vancouver is constructing the Annacis Water Main South in Surrey and Delta to increase the delivery of high-quality drinking water to communities south of the Fraser River. The Annacis Water Main South is approximately 3 kilometres long and 1.8 metres in diameter. It will run from River Road to 90 Avenue.</p><p>The project has been divided into three phases. Phase one was completed in 2022 and phase two is currently in construction. </p><p>The Scott Road section is the third phase, scheduled to take place from summer 2026 to fall 2028. It will be approximately 1 kilometre long and includes the construction of two flow meter chambers and a water main along 119B Street, Scott Road/120 Street, and Holt Road in Surrey and Delta. ​</p><p> <i class="fa-light fa-file">​</i> ​<a href="/services/water/ConstructionDocuments/annacis-water-main-south-scott-road-section-factsheet.pdf" target="_blank">Fact S​heet – Annacis Water Main South – Scott Road Section​</a></p></div>Cities of Surrey and DeltaProject

 

 

Project UpdateProject Update<div class="ExternalClassC8B441D7FE15406FBE0BC10D965DEA5C"><p>Beginning in July, the water main will be installed in segments, starting from 119B St between 94 Ave and 93A Ave, and 93A Ave between 119B St and 120 St in Delta. This segment is expected to be complete in winter 2026.</p><p>Impacts:</p><ul><li>No through-traffic on 119B St between 94 Ave and 93A Ave, and 93A Ave between 119B St and 120 St during work hours</li><li>Street parking will be blocked along 119B St</li><li>Our Community Liaison will work with businesses with impacted driveways to arrange alternate access for deliveries</li><li>You may notice dust and moderate noise from excavators, trucks, and generators during work hours</li></ul><p>Please <a href="/services/water/ConstructionDocuments/annacis-water-main-south-scott-road-section-upcoming-water-main-installation-newsletter.pdf" target="_blank">read our late​​st newsletter​</a> ​to learn more.</p></div>7/3/2026 7:00:00 AM

 

 

AnnacisWaterMainSouth-project-location-maphttps://metrovancouver.org/services/water/ConstructionImages/_t/AnnacisWaterMainSouth-project-location-map_jpg.jpgAnnacisWaterMainSouth-project-location-map
annacis-water-main-south-scott-road-section-maphttps://metrovancouver.org/services/water/ConstructionImages/_t/annacis-water-main-south-scott-road-section-map_jpg.jpgannacis-water-main-south-scott-road-section-map

 

 

Project activitiesProject activities<div class="ExternalClass0BAC3ABB42504259A36174AF479BADAB"><p>​​<strong>Site preparation</strong></p><p>Ahead of major construction activities, the contractor will: </p><ul><li>Install construction signage and tree protection fencing</li><li>Set up a temporary storage area and site office trailers</li><li>Deliver equipment and materials </li><li>Collect soil samples to understand ground conditions </li><li>​Relocate existing utilities to accommodate new infrastructure </li></ul><p>​​<strong>Construction</strong></p><p>Once the site is ready for construction, the contractor will:</p><ul><li><strong>Install the water main:</strong> The new water main will be installed in segments. This work will include setting up a 200-metre work zone, excavating a large trench, placing wall supports, installing steel pipes with a diameter of 1.8 metres, and temporarily restoring the impacted roadway before moving to the next segment. </li><li><p><strong>Construct two underground flow meter chambers: </strong> Two flow meter chambers will be constructed to measure the water flow in the new main. One chamber will be located at the intersection of 93A Avenue and 120 Street, and the other at Holt Road and 90 Avenue.</p><p>This work will include investigating the site, excavating a large trench, building an underground concrete chamber, installing conduit to connect the new meter to an existing electrical kiosk, and temporarily restoring the area. Each flow meter chamber will take approximately six months to construct. </p></li><li><strong>Clean and test the water main:</strong> Crews will excavate a small area at each end of the water main to conduct pressure testing and disinfect the new pipes. </li></ul><p>​​<strong>Restoration</strong></p><p>During the restoration phase, construction crews will permanently restore roadways, sidewalks, curbs, boulevards, and other impacted areas to previous or better condition.</p><p>​​<strong>Water main connection</strong></p><p>Once the entire Annacis Water Main South is constructed, Metro Vancouver will return to the area to connect the new water main to the existing water distribution system via the Annacis Water Supply Tunnel and the Kennedy Newton Water Main.</p></div>
Impacts and mitigationImpacts and mitigation<div class="ExternalClass53A6783C89B0461F98863DA7A5B667CE"><p>Metro Vancouver recognizes that project activities will impact residents, schools, businesses, and commuters. Construction impacts may include noise, dust, driveway and road closures, and parking restrictions.</p><p>As part of our commitment to minimize these impacts, we will work with the City of Surrey and City of Delta to identify impacts early and take measures to prevent or reduce them. Wherever possible, the contractor will: </p><p><strong>Traffic and safety</strong></p><ul><li>Develop and implement a project-specific traffic management plan </li><li>Use fencing, traffic control personnel, and signage to support safe movement around the area</li><li>Schedule extended daytime and nighttime work on Scott Road/120 Street during summer months to minimize traffic impacts</li><li>Keep driveway disruptions to a minimum and provide alternate residential parking spaces as needed </li><li>Coordinate traffic management with both municpalities and other stakeholders, including transit and railway operators </li></ul><p><strong>Noise and vibration</strong></p><ul><li>Install sound barriers and cover noisy equipment during use </li><li>Avoid noisy activites, such as hydro-vacuuming and jackhammering, before 8:00 am on weekdays and 9:00 am on Saturdays</li><li>Monitor noise and vibration regularly to ensure compliance with municipal bylaws and granted bylaw variances</li></ul><p><strong>Air quality and dust</strong></p><ul><li>Minimize idling of construction vehicles</li><li>Keep the site and surrounding areas clean through road sweeping and watering</li></ul><p><strong>Garbage collection</strong></p><ul><li>Provide temporary access for solid waste and recycling collection vehicles</li><li>Alternatively, assist residents by moving waste bins to a designated collection area</li></ul></div>
Work hoursWork hours<div class="ExternalClass43CD5CAC5D3B46A3AB81BFD90C5652E1"><p>Typical work hours will be:</p><p><strong>Surrey</strong></p><ul><li><strong>Monday to Saturday:</strong> 7:00 am – 5:00 pm</li><li><strong>Sunday and holiday:</strong> No work planned</li></ul><p><strong>Delta</strong></p><ul><li><strong>Monday to Friday:</strong> 7:00 am – 5:00 pm</li><li><strong>Saturday: </strong>9:00 am – 5:00 pm</li><li><strong>Sunday and holiday:</strong> No work planned</li></ul><p>All work will comply with the City of Surrey and City of Delta bylaws or granted bylaw variances.</p><p>There may be times when crews will need to work longer hours to complete critical activities safely and efficiently. Metro Vancouver will notify the community about these activities in advance. <br></p></div>
EngagementEngagement<div class="ExternalClassD2E0108FDC6B464ABBFFABE343CEFBCC"><p>We are committed to working with the community to minimize construction impacts wherever possible. If you have concerns about this project, please contact our community liaison.</p><p><strong>Keeping the community updated</strong></p><p>Metro Vancouver will keep the community informed as the project progresses by sending updates through print notifications, emails, the project website, and on-site signage. You can subscribe to our mailing list to receive updates via email by selecting the project name in the <a href="/services/water/water-engagement-mailing-list" target="_blank">water projects sign-up page​</a>.</p><p>Our community liaison is also available throughout the project to address any questions or comments you may have.<br></p></div>
Project materialsProject materials<div class="ExternalClassD624F1C92904443CA13047551ED2E5B7"><ul class="fa-ul"><li> <span class="fa-li"><i class="fa-light fa-file"></i></span><a href="/services/water/ConstructionDocuments/annacis-water-main-south-scott-road-section-factsheet.pdf" title="Fact sheet - Annacis Water Main South – Scott Road Section" target="_blank">Fact S​heet – ​Anna​cis Water Main South – Scott Road Section</a><br></li></ul> <strong>​Newsletters</strong><br> <ul class="fa-ul"><li> <span class="fa-li"><i class="fa-light fa-file"></i></span><a href="/services/water/ConstructionDocuments/annacis-water-main-south-scott-road-section-upcoming-water-main-installation-newsletter.pdf" target="_blank">​​2026 - July 3​ - Project Update​</a><br></li></ul></div>
Related linksRelated links<div class="ExternalClassADFD97BE5D4A49779DD0E9E6F2917FCA"><ul class="fa-ul"><li> <span class="fa-li"><i class="fa-light fa-link"></i></span> ​<a href="/services/water/the-regional-system">Regional drinking water system​​</a></li><li>​​<span class="fa-li"><i class="fa-light fa-link"></i></span> ​<a href="/services/water/its-all-drinking-water">Water conservation tips​</a></li></ul> <br>​<br> </div>

 

 

Summer 2026Summer 2026<div class="ExternalClass3E784BFA001C4A5BBA99E069DE70D374">Site preparation​<br></div>0
Summer 2026 - late 2027Summer 2026 - late 2027<div class="ExternalClass99DE9BA5241546E2AAD0AF04C6230350">​Construction​<br></div>1
Spring 2027Spring 2027<div class="ExternalClassF94A020331F242E58C0584691318374E">Re​storation</div>0
Fall 2028Fall 2028<div class="ExternalClassD8760EE5893241B69E07549B45B7331E">Water main connection​<br></div>0

Contact us


Community liaison
Monday – Friday​​​
8:00 am – 4:30 pm

  • Email
  • 604-432-6200​​​

After hours emergencies

  • 604-451-6610​

Stay conne​cted


Subscribe to our mailing list to receive updates about our water projects.

Sign Up​​​​​​​

This website uses cookies to ensure you get the best experience. By continuing to use this site, you accept our use of cookies. View our privacy statement.