Annacis Water Main South

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

 

 

Annacis Water Main SouthAnnacis Water Main South<div class="ExternalClassF4B004AFAB3D42369216A5E1A3E2377B"><p></p><p>Metro Vancouver is constructing the Annacis Water Main South in Surrey and Delta to increase the delivery of high-quality drinking water to communities south of the Fraser River. ​<br></p><p>The Annacis Water Main South is approximately 3 kilometres long and it will run from River Road to 90 Avenue. This new water main is 1.8 metres in diameter.</p><p>The project has been divided into three phases. Phase one was completed in 2022, and the remaining phases are expected to be completed by 2028.​<br></p></div>City of Surrey and DeltaProject

 

 

 

 

Phase 2https://metrovancouver.org/services/water/annacis-water-main-south-phase-2, Annacis Water Main South - Phase 2Phase 2

 

 

Map showing all construction phases of the Annacis Water Main South project.https://metrovancouver.org/services/water/ConstructionImages/_t/map-project-location-annacis-water-main-south_jpg.jpgMap showing all construction phases of the Annacis Water Main South project.
Illustration comparing the size of the new water main with a human being.https://metrovancouver.org/services/water/ConstructionImages/_t/graphic-water-main-size-annacis-water-main-south_jpg.jpgIllustration comparing the size of the new water main with a human being.

 

 

Project activitiesProject activities<div class="ExternalClass865DE65CA97D479FB500E9B15CCBF8BF"><p> <strong>Phase 1</strong><br>Phase one is complete. This portion of the water main is approximately 300 metres long and located along 96 Avenue, between 119B Street and 117B Street, in Surrey and Delta.</p><p>Activities included:</p><ul><li>Constructing two tunnel shafts, one at each side of the Southern Railway of British Columbia</li><li>Using a tunnel boring machine to tunnel along 96 Avenue</li><li>Installing the water main inside the tunnel</li><li>Restoring the area to similar or better condition</li></ul><p>Tunnelling was necessary to avoid disruptions to the Delta Creek and railway.</p><p> <strong>Phase 2</strong><br>This portion of the water main is 1.4 kilometres long. It will run from River Road to 117 B Street, in Surrey.</p><p>Activities for phase two will include:</p><ul><li>Installing the water main</li><li>Constructing two valve chambers and a flow meter chamber</li><li>Restoring impacted areas to previous or better condition​<br></li></ul><p>For more details about activities, please visit <a href="/services/water/annacis-water-main-south-phase-2">phase two page</a>.<br></p><p> <strong>Phase 3</strong><br>This portion of the water main is approximately 1 kilometre long. It will run across Delta and Surrey, from 119B Street to 90 Avenue.</p><p>We will share information about phase three activities once available.<br></p><p></p></div>
EngagementEngagement<div class="ExternalClass8F58A1A15C9640CD877AF5EEF82DED2C"><p>​We are committed to working with the community to minimize construction impacts wherever possible. If you have concerns about this project, please contact our community liaison.<br></p><div><br></div><p><strong>​​Keeping the community updated</strong></p><p>Metro Vancouver will keep the community informed as the project progresses by sending updates through print notifications, email, the project website, and on-site signage. You can subscribe to our mailing list to receive updates via email by selecting the project name in the <a href="/services/water/water-engagement-mailing-list">water projects sign-up page</a>. </p><p>Our community liaison is available throughout the project to address any questions or comments you may have about the Annacis Water Main South. ​<br></p></div>
Project materialsProject materials<div class="ExternalClass3A9962D962854A2C8DF04101B8530BB0"><ul class="fa-ul"><li> <span class="fa-li"><i class="fa-light fa-file"></i></span>​ <a href="/services/water/ConstructionDocuments/fact-sheet-annacis-water-main-south-phase-2.pdf" target="_blank" title="Fact Sheet – Annacis Water Main South – Phase 2">Fact Sh​eet – Annacis Water Main South – Phase 2</a></li></ul></div>
Related linksRelated links<div class="ExternalClass7B70E5F6D77B4D2BA37632A641884FC8"><ul class="fa-ul"><li> <span class="fa-li"> <i class="fa-light fa-link"></i></span> <a href="/services/water/the-regional-system">Regional drinking water system</a></li><li> <span class="fa-li"> <i class="fa-light fa-link"></i></span> <a href="/services/water/its-all-drinking-water">Water conservation tips​</a><br></li></ul></div>

 

 

2021 - 20222021 - 2022<div class="ExternalClass3B7B16D8519744129E2C743B51B20336"><p>​Phase one<br></p><div></div><p></p></div>0
2025 - 20282025 - 2028<div class="ExternalClassA3830E82A7854B1391A288CE9782EF58"><p>Pha​​​se two<br></p></div>0
2026 - 20282026 - 2028<div class="ExternalClass9DCBA719E4D24952930CDFAA4291AF0E"><p>​Phase three<br></p></div>0

Contact us


Community liaison
Monday – Friday​​​
8:00 am – 4:30 pm

  • Email
  • 604-432-6200​​​

After hours emergencies

  • 604-451-6610​​​​​​​​

Stay connected


Subscribe to our mailing list to receive updates about our water projects.

Sign Up​​​​​

This website uses cookies to ensure you get the best experience. By continuing to use this site, you accept our use of cookies. View our privacy statement.