South Section

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

 

 

South SectionSouth Section<div class="ExternalClassD5A36F7FC0C8419986006F7A5BA932BF"><p></p><p>The South Section of the Gilbert Road Sewer Project extends from the Lulu Island Wastewater Treatment Plant to Steveston Highway. Construction began in early 2023 and will continue for approximately two years. <br></p><p>This two-kilometre-long section is using open-cut construction methods, which involves digging a trench to install pipe. Work is progressing along Gilbert Road in segments. Crews started at the Lulu Island Wastewater Treatment Plant and are moving​ northward towards Steveston Highway. The length of each segment and the duration of its construction varies depending on technical factors. Crews may need to stay in some locations for longer periods to complete specific tasks such as maintenance hole upgrades and ditch crossings ​<br></p><p><a href="/services/liquid-waste/ConstructionDocuments/factsheet-gilbert_road_sewer-south_section.pdf" target="_blank">​Fact Sheet - Gilbert Road Sewer ​- South Se​ction​</a><br></p></div>Gilbert Road, from the Lulu Island Wastewater Treatment Plant to Steveston Highway, City of RichmondProject

 

 

 

 

Gilbert road sewer project - south section maphttps://metrovancouver.org/services/liquid-waste/ConstructionImages/_t/gilbert-rd-sewer-south-section-map_jpg.jpgGilbert road sewer project - south section map

 

 

Impacts and mitigationImpacts and mitigation<div class="ExternalClassB70DECE557C948AE9D5816FFF126A828"><p>Construction impacts associated with this work include:</p><ul><li>Temporary road closures and delays</li><li>Occasional restricted access to properties along Gilbert Road</li><li>Construction vehicles in the area</li><li>Selective tree removal</li><li>Construction noise and vibration</li><li>Parking and sidewalk restrictions</li></ul>​​ <p>As part of the project, crews will also be relocating 1.65 kilometers of City of Richmond water mains along the project alignment. By completing these works as part of this project, the roadway will not need to be disturbed in the future to replace these aging pipes. A section of water main within Steveston Highway will also be relocated as part of this section. </p>​ <p>Vehicle, cyclist and pedestrian access along Gilbert Road will be affected; non-local residents should take alternate routes. Residents and businesses will be notified about specific upcoming access impacts as the project progresses.</p>​ ​<br></div>
Work hoursWork hours<div class="ExternalClass227B2445478E4E478E1396EDE5AB3A1D"><p>Work will generally occur from Monday to Friday, between 7:00 am and 8:00 pm, and on Saturdays as required between 10:00 am and 8:00 pm. There may be times when crews will need to work extended hours to complete specific tasks and/or stay on schedule. In these cases, Metro Vancouver will notify the community ahead of time. </p><p>All work will comply with the City of Richmond’s bylaws or granted bylaw variances. Crews will attempt to reduce noise wherever possible.</p>​<br></div>
EngagementEngagement<div class="ExternalClass2453159BA8004574AF2F736F196D417B"><p>A Community Liaison has been assigned to meet with business owners, residents, and community members to discuss project impacts, compile public feedback, and be available to address any questions or concerns. Please see “Contacts” for ways to get in touch with the Community Liaison.​</p><p>Residents and businesses will be notified about specific impacts as the project progresses. We will continue to work with individual property owners throughout construction to mitigate impacts as much as possible. </p>​ </div>
Project materialsProject materials<div class="ExternalClass4CCF6D858B504A519BB6C07B4B096ABB"><p>Fact Sheet</p><ul class="fa-ul"><li> <span class="fa-li"><i class="fa-light fa-file"></i></span><a href="/services/liquid-waste/ConstructionDocuments/factsheet-gilbert_road_sewer-south_section.pdf" target="_blank">Fact S​heet – Gilbert Road Sewer –​ South Section​</a></li>​</ul><p>Newsletters​<br></p><ul class="fa-ul"><li> <span class="fa-li"><i class="fa-light fa-file"></i></span><a href="/services/liquid-waste/ConstructionDocuments/gilbert-road-sewer-south-section-faq.pdf" target="_blank">2021 –​ July – F​requently Ask​​ed Questions</a> </li><li> <span class="fa-li"> <i class="fa-light fa-file"></i></span> <a href="/services/water/ConstructionDocuments/gilbert-road-sewer-south-section-mobilization-letter.pdf" target="_blank">2024 – February –​​​ Mobilization Letter</a>​​<br></li><li> <span class="fa-li"><i class="fa-light fa-file"></i></span><a href="/services/water/ConstructionDocuments/gilbert-road-sewer-south-section-mobilization-letter.pdf" target="_blank"> 2024 – March – Project Update</a>​<br></li><li> <span class="fa-li"> <i class="fa-light fa-file"></i></span> <a href="/services/liquid-waste/ConstructionDocuments/gilbert-road-sewer-newsletter-may2024.pdf" target="_blank"> 2024 – May –​ Project Update</a><br></li><li> <span class="fa-li"><i class="fa-light fa-file"></i></span>​​<a href="/services/liquid-waste/ConstructionDocuments/newsletter-traffic-pattern-changes-at-steveston-hwy-and-gilbert-intersection-gilbert-road-sewer-south-section-2024-08.pdf" target="_blank">2024 – August – ​​Traffic Pattern Changes​</a><br>​<br></li></ul>​​<br></div>​<br>

 

 

2023 –20252023 –20251

Contacts


Information​ Centre
Monday – Friday
8:00 am – 4:30 pm

  • Email
  • 604-432-6200​​​

After hours emergencies

  • 604-451-6610​

Stay connected


Subscribe to our mailing list to receive updates about our liquid waste projects.

Sign Up​​​​​​

By continuing to use our website, you acknowledge the use of cookies. Privacy Statement | Accept all cookies | Change settings