Liquid Waste Development Cost Charges

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​Funding Wastewater System Expansion

Metro Vancouver collects Development Cost Charges (DCCs) for new residential and non-residential developments in the region to pay for new sanitary sewer works such as additional trunk lines, pumping stations, and wastewater treatment plant expansion that are needed to deliver wastewater services to the future residents of these buildings. These fees are defined in the Development Cost Charge Bylaw.

Calculating the Development Cost Charges

DCCs are calculated based on the type of development and the location. The Lower Mainland is divided into four sewerage areas, Fraser, Lulu Island West, North Shore, Vancouver which include all of the region's municipalities except for the villages of Anmore, Belcarra and Lions Bay.  

Updates to Development Cost Charges

Metro Vancouver is currently pursuing the goal of collecting DCCs to aid funding of new regional water infrastructure to support our growing region. Information regarding the proposed water DCC, including draft rates, are posted on the DCC project website.

Collecting the Development Cost Charges

Local municipalities are responsible for collecting the charge. This is usually done at the subdivision approval stage for single-family residential developments and the building permit stage for other types of development.

The chart below outlines the general rates.

Overview

Metro Vancouver’s DCC Program Metro Vancouver collects development cost charges (DCCs) to recover the costs of regional growth-related infrastructure (water, wastewater, and regional park land acquisition) that is needed to support our growing population.

​​​​​Funding wastewa​​ter system expansion

Most local governments have DCCs for growth driven costs to expand local infrastructure (roads, drainage, water, sewer, parks). Without DCCs, larger sewer infrastructure, such as treatment plants, sewer mains, and pump stations – would primarily be paid for through utility fees and property taxes. DCCs substantially pay for the cost of the infrastructure driven by growth needed to service our region.

​Calculating the development cost charges

DCCs are calculated based on the type of development and the location. The Metro Vancouver region is divided into four sewerage areas: Fraser, Lulu Island West, North Shore, and Vancouver.

For each sewerage area, the DCCs are based on four separate land use categories : residential (detached single-family, duplex and triplex), townhouse, apartment, and non-residential. Residential, townhouse, and apartment are charged per unit/dwelling, while non-residential developments are charged per square foot.​

Collecting the development cost charges

Local municipalities are responsible for collecting Metro Vancouver Development Cost charges. This is usually done at the subdivision approval stage for single-family residential developments and the building permit stage for other types of development.

Liquid Waste DCC rates are by sewerage area and land use category (effective: January 1, 2025).​​

​ ​
​​Assist Factor
Jan 1, 2​025
16%
Jan 1, 2026
10%
Jan 1, 2027
1%
VSA
Residential Lot Development Unit $10,498 $11,290 $12,476
​​​Townhouse Dwelling Unit $9,593 $10,316 $11,400
Apartment Dwelling Unit
$6,298 $6,772 $7,484
Non-Residential (per square foot) $5.30 $5.70 $6.30
NSSA
Residential Lot Development Unit​​​$9,760$10,478$11,557
Townhouse Dwelling Unit$8,996$9,658$10,652
Apartment Dwelling Unit$6,005$6,448$7,111
Non-Residential (per square foot)​$5.00$5.37$5.92​​​
LISA
Residential Lot Development Unit$5,683$6,152$6,855
Townhouse Dwelling Unit$4,927$5,333$5,943
​Apartment Dwelling Unit$3,516$3,806$4,241
Non-Residential (per square foot)$2.55$2.76$3.08​​​
FSA
Residential Lot Development Unit$11,443$12,311$13,613
Townhouse Dwelling Unit$10,015$10,775$11,914
Apartment Dwelling Unit$7,302$7,855$8,686
Non-Residential (per square foot)​$5.41$5.82$6.43
​​

A list of DCC liquid waste capital growth projects can be found in the DCC Capital Growth Program 2023 Budget. The above effective January 1, 2025 DCC rates include interest costs to finance the infrastructure projects.​​

​​​​For information on in-stream applications or waiver exemptions visit the Development Cost Charges page.

​​​​​

​​

Related links

Contacts​


Financ​ial Services

  • Email
  • Metro Vancouver 26th floor, Metrotower III 4515 Central Boulevard, Burnaby, BC V5H 0C6​

Waiver or Reduction for Not-for-Profit Rental Housing

Regional Planning and Housing Services
  • Email
  • Metro Vancouver ​10th floor, Metrotower III 4515 Central Boulevard, Burnaby, BC V5H 0C6 ​​

Stay connected​​


Subscribe ​​to the​ DCC mailing list to be notified of any events or information updates.

Sign Up​​​​​​​​​​​​​

This website uses cookies to ensure you get the best experience. By continuing to use this site, you accept our use of cookies. View our privacy statement.